DfT consultations
Current DfT consultations.
limited to the area of Greater Manchester Cycling Campaign:
5 issues found for 'consultation':
Created by JonathanF // 1 thread
Announced in 2015 as part of CCAG2. Manchester City Council, working in partnership with Transport for Greater Manchester and Salford City Council, is developing a City Centre Cycling Infrastructure Plan (CCCIP). The plan will:-
Provide a strategy to guide future investment
Provide a pipeline of cycling schemes
Prioritise cycling and transport infrastructure more effectively
Assist with bidding for future funding for investment in the city centre cycle network
A draft network plan (v3.2) was circulated at the 22nd March 2016 Stakeholder Workshop: https://drive.google.com/file/d/0B_1SI7iBXu3BN3dDbXpvSnRYYkE
GMCC has held its own workshops and discussions to produce its draft plan, the latest of which is: https://drive.google.com/file/d/0B_1SI7iBXu3BNjJDQ19rUjVEMWc
Created by JonathanF // 1 thread
Single lane [30mph] traffic with wider pavements, permanent parking bays, new bus lay-bys, bus stop relocation, dedicated [advisory, due to parking bays] [1.5m wide] cycle lanes [no buffer, so in the door zone] and improved public realm, closure of the junction of Bury New Road and Warwick Street and the [since withdrawn] introduction of a one-way system along Clifton Road.
2016-02-23 Report: https://councildecisions.bury.gov.uk/documents/s10166/Prestwich%20High%20Street%20Regeneration%20Scheme%20-%20Cabinet%20report%20for%202nd%20March%202016%20-%20Open%20report%20-%20Fina.pdf
2016-03-02 Members accepted recommendations to:
(a) Instruct officers to undertake detailed designs and obtain tenders in respect of delivering Proposal One subject to the following amendments and within the approved budget:
i) Clifton Road to remain open in both directions. The situation will be monitored for a period of 12 calendar months from completion of the scheme as to its effect on traffic flows, congestion and safety.
ii) The on street (adopted) parking bays to be reduced in length and additional street trees to be included to improve the aesthetic appearance. Parking bays to be subject to restrictions of 60 minutes with no return with 1 hour.
iii) Officers to work with Transport for Greater Manchester to ensure traffic light sequencing is maximised to reduce congestion.
(b) Delegate authority to the Chief Executive and the interim Executive Director of Resources and Regulation, in consultation with the Leader of the Council, to consider all tenders received and to approve the awarding of the contract to undertake the approved scheme within the approved budget.
(c) Instruct officers to seek opportunities to secure additional match funding and sponsorship specifically in respect to street furniture, signage and planting
Created by David Butler // 1 thread
Consultation by Manchester CIty Council on cycleway proposals along Wilmslow Road from Platt Lane to Barlow Moor Road.
Created by JonathanF // 1 thread
Place-holder for Corridor Cycleway Section 7 discussions
532 threads found for 'consultation':
A discussion on issue
TfL Consultation: Bricklayers Arms Roundabout – Subway Closure
Shaun McDonald
posted
Bristol Cycling Campaign
A discussion on issue
Consultation on Ashton Rd / Coronation Rd
Eric Booth
posted
A discussion on issue
Consultation on Ashton Rd / Coronation Rd
Shaun McDonald
posted
A discussion on issue
TfL Consultation: CS5 Cycle Superhighway
Shaun McDonald
posted
A discussion on issue
Bear Pit / St James Barton Consultation
Eric Booth
posted
A discussion on issue
TfL Consultation: Proposed improvements at the junction of Mile End Road and Burdett Road
Shaun McDonald
posted
A discussion on issue
Bristol Road LSTF funded improvements
Chris Lowe
posted
5 library items found for 'consultation':
No planning applications found for 'consultation'.