DfT consultations
Current DfT consultations.
limited to the area of Greater Manchester Cycling Campaign:
5 issues found for 'consultation':
Created by JonathanF // 1 thread
Announced in 2015 as part of CCAG2. Manchester City Council, working in partnership with Transport for Greater Manchester and Salford City Council, is developing a City Centre Cycling Infrastructure Plan (CCCIP). The plan will:-
Provide a strategy to guide future investment
Provide a pipeline of cycling schemes
Prioritise cycling and transport infrastructure more effectively
Assist with bidding for future funding for investment in the city centre cycle network
A draft network plan (v3.2) was circulated at the 22nd March 2016 Stakeholder Workshop: https://drive.google.com/file/d/0B_1SI7iBXu3BN3dDbXpvSnRYYkE
GMCC has held its own workshops and discussions to produce its draft plan, the latest of which is: https://drive.google.com/file/d/0B_1SI7iBXu3BNjJDQ19rUjVEMWc
Created by JonathanF // 1 thread
Single lane [30mph] traffic with wider pavements, permanent parking bays, new bus lay-bys, bus stop relocation, dedicated [advisory, due to parking bays] [1.5m wide] cycle lanes [no buffer, so in the door zone] and improved public realm, closure of the junction of Bury New Road and Warwick Street and the [since withdrawn] introduction of a one-way system along Clifton Road.
2016-02-23 Report: https://councildecisions.bury.gov.uk/documents/s10166/Prestwich%20High%20Street%20Regeneration%20Scheme%20-%20Cabinet%20report%20for%202nd%20March%202016%20-%20Open%20report%20-%20Fina.pdf
2016-03-02 Members accepted recommendations to:
(a) Instruct officers to undertake detailed designs and obtain tenders in respect of delivering Proposal One subject to the following amendments and within the approved budget:
i) Clifton Road to remain open in both directions. The situation will be monitored for a period of 12 calendar months from completion of the scheme as to its effect on traffic flows, congestion and safety.
ii) The on street (adopted) parking bays to be reduced in length and additional street trees to be included to improve the aesthetic appearance. Parking bays to be subject to restrictions of 60 minutes with no return with 1 hour.
iii) Officers to work with Transport for Greater Manchester to ensure traffic light sequencing is maximised to reduce congestion.
(b) Delegate authority to the Chief Executive and the interim Executive Director of Resources and Regulation, in consultation with the Leader of the Council, to consider all tenders received and to approve the awarding of the contract to undertake the approved scheme within the approved budget.
(c) Instruct officers to seek opportunities to secure additional match funding and sponsorship specifically in respect to street furniture, signage and planting
Created by David Butler // 1 thread
Consultation by Manchester CIty Council on cycleway proposals along Wilmslow Road from Platt Lane to Barlow Moor Road.
Created by JonathanF // 1 thread
Place-holder for Corridor Cycleway Section 7 discussions
532 threads found for 'consultation':
A discussion on issue
Central London Grid / Quietway - Earls Court Square area
Simon Munk
posted
A discussion on issue
Islington section of Central London Cycling Grid
John Ackers
posted
A discussion on issue
Thames Path Quietway - Pensinsula Ward Proposals
Simon Munk
posted
Westminster Cycling Campaign
A discussion on issue
Quietway Cycle Route Link in Bayswater
Dominic Fee
posted
A discussion on issue
Billet Road E17
Simon Munk
posted
A discussion on issue
Traffic changes proposed for Cable Street, CS3 and area
Simon Munk
posted
A discussion on issue
Bedfont Road Cycling Improvements, Hounslow
Simon Munk
posted
Camden Cyclists
A discussion on issue
Proposed changes to Miller Street NW1
Mixhael
posted
Hackney Cycling Campaign
A discussion on issue
Consultation - Chatsworth Road and Brooksby's Walk
Simon Munk
posted
Camden Cyclists
A discussion on issue
Brunswick Square Walking and Cycling Improvements
Stefano B
posted
Camden Cyclists
A discussion on issue
Midland Road and Euston Road / Judd Street Junction (North – South CS link)
@lastnotlost
posted
A discussion on issue
Melbourne Grove traffic speed and volume
Elizabeth E.
posted
A discussion on issue
Junction Road - Cycle Improvement Scheme
RHA
posted
London Cycling Campaign
A discussion on issue
North-South Cycle Superhighway (extension to Kings Cross)
danB
posted
London Cycling Campaign
A discussion on issue
North-South Cycle Superhighway (extension to Kings Cross)
Jean Dollimore
posted
A discussion on issue
Quietway Q4 Clapham Common - Wimbledon
@lastnotlost
posted
London Cycling Campaign
A discussion on issue
Cycle Superhighway 11 in Westminster and Camden
Angela Hobsbaum
posted
London Cycling Campaign
A discussion on issue
Cycle Superhighway 11 in Westminster and Camden
Angela Hobsbaum
posted
London Cycling Campaign
A discussion on issue
Changes to the King's Cross gyratory
Simon Munk
posted
Westminster Cycling Campaign
A discussion on issue
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Simon Munk
posted
Westminster Cycling Campaign
A discussion on issue
Cycle Superhighway 11 in Westminster and Camden
Jean Dollimore
posted
A discussion on issue
Highbury Corner - improvements for pedestrians & cyclists
Si Izod
posted
A discussion on issue
Lower Clapton Road / Urswick Road Junction Consultation
Simon Munk
posted
A discussion on issue
Q5 Waterloo To Croydon
@lastnotlost
posted
Hackney Cycling Campaign
A discussion on issue
Seven Sisters Road Consultation
Simon Munk
posted
5 library items found for 'consultation':
No planning applications found for 'consultation'.